Download PIN (131 Kb PDF) - August 2007
The project proposed to install 7MW of new hydro power capacity in the Li County of Aba Tibetan Autonomous Area of Sicuan Province in Central China. It is designated as a low-head dam diversion type hydropower station with 2×3.5MWhydro turbines for operation. The annual electricity output is about 31,707MWh. The power station will be connected to the Provincial Grid and in turn to the Central China Power Grid.