SETatWork Sustainable Energy Technology at Work SETatWork Home Page
Events  Help |  Assessment Tool |  Keyword Index |  SETatWork Home |
T@W Sustainable Energy Technology at Work - Home Page
Google Search

Good Practice: Construction of biomass boiler plant and extension of existing heat supply network, Bulgaria

PDF IconDownload the Good Practice Case Study (68 Kb PDF)

Summary: The project provides for construction of boiler facilities and heat supply network for production of heat from biomass - wood wastes, to supply industrial and teritiary consumers for space heating and domestic hot water production.

Aims: To sell thermal energy to consumers by using RES thus providing both economic and environmental benefits.

Summary of Results: Energy produced from RES and sold to different types of customers. Reduction of GHG emissions from substitution of electricity or light fuel oil for heating purposes with biomass.

Planning Time: The facility is planned to be operational from November 2006.

Planning issues: Only first stage (first 5 MW boiler) of the whole planned capacity is foreseen.

Operation Time: 20 years.

Keywords

To find similar reports, click on a keyword below:
T@W: Sustainable Energy Technology at Work (2006-2008) : Biomass and Bioenergy : Forestry and Energy Crops : Heat Generation, Recovery and Use : Renewable Energy Technologies : Waste to Energy : Wastes and Residues

Contacts

BULGARIA

EnCon Services Ltd